EXAMPLE #4, (TOP) This is from the 5th Dec 2007. It is the east entrance again of the 3 Door heavy concrete bunker near Infantry Point. The rebar at right are still pretty much flush against the wall
EXAMPLE #4, (BELOW) The same doorway as at 10th Jan 2009. Now the rebar has been worked on and it is sticking out on the right side of that passageway.
#4, (TOP) - This image is from the 17th Feb 2010; the rebar that stuck out before is now gone, cut off.EXAMPLE
EXAMPLE
#4, (BOTTOM PHOTOS) - Same area, same date, photo taken from the other direction.
EXAMPLE #4 (Above) Close up of the remaining rebar shows fresh cuts.
EXAMPLE #4 (Below) This is just one of many other fresh rebar cuts in the 3 Door heavy concrete bunker but for which I don’t have any ‘Before Images’.